Gypsum products application process

Simple. Fast. Efficient.

Whether you’re using gypsum plaster, gypsum boards, or gypsum powder, the application process is designed to be quick and clean — delivering smooth, durable results every time.

Step 1
Surface Preparation
  • Clean the surface of dust, oil, or loose material.
  • For smooth concrete, apply Bond It to improve adhesion.
  • Dampen the surface lightly if required.
Step 2
Mixing (for Plaster or Powder)
  • Mix gypsum plaster or powder with clean water in a 1:0.6–0.7 ratio by weight.
  • Stir continuously until a smooth, lump-free paste forms.
  • Use within 20–25 minutes of mixing.
Step 3
Application
  • Apply the plaster evenly using a trowel or putty blade.
  • For gypsum board, fix sheets using drywall screws or a stud frame.
  • Maintain the recommended thickness (e.g., 10–12 mm for plaster).
Step 4
Finishing
  • Level the surface while wet for a smooth finish.
  • For gypsum board, tape joints and apply jointing compound.
  • Allow to set completely before sanding or painting.
Step 5
Curing & Drying
  • No water curing is needed.
  • Allow natural drying for at least 24–48 hours.
  • Ensure proper ventilation for best results.
Scroll to Top